Status: Live (2026-07-03) This page is the authoritative per-gate completion ledger for the tiered portfolio (target-roadmap, D-034). Each Gate has one record listing its acceptance criteria, per-criterion status, evidence, and sign-off date. A Gate is closed only when every criterion is met; a single unmet criterion blocks the next tier. Gate P0 records the primary-chain completion covenant (D-045), which is stricter than the G0 behavior/budget slice. Unlike development-log (a stream of engineering milestones), this page records the phase boundary decisions: whether the current phase’s Definition of Done is satisfied, with auditable evidence.

How to use

  • Add a new ## Gate GN section when a Gate’s first criterion starts.
  • Update status to ✅ / ❌ / 🟡 (met / unmet / in-progress) as work lands.
  • Record evidence as reproducible commands and commit ranges, not prose.
  • A Gate closes with a **Closed: YYYY-MM-DD** line; until then it stays Open.

Gate G0 — Tier-0 exit (current phase goal)

Definition of Done: the shared scenario (Counter, then ValueVault) passes in testkit (RFC 0007) on evm, solana-sbpf-asm, and wasm-near — behavior parity and resource budgets (D-040 / RFC 0010). Status: Closed Closed: 2026-07-03

Acceptance criteria

Carry-over work after Gate G0

Gate G0 closes the shared behavior/resource-budget slice. It does not close Gate P0. The remaining primary-chain production hardening stays active:
  1. EVM semantic-plan migration (Workstream 3: ExprPlan/StmtPlan/ EntrypointPlan/EventPlan/CrosscallPlan/MetadataPlan).
  2. Solana Pinocchio live dual-deploy equivalence CI/toolchain hardening and broader reference coverage (Workstream 7).
  3. NEAR/Wasm target-first local execution/deploy metadata sign-off.

Sign-off

Gate G0 closed on 2026-07-03 at commit 0c52fb8 after GitHub CI run 28658576786 completed successfully. The closing run validates the current just check CI surface, including the unified testkit, Solana light gates, EVM Foundry/Anvil gates, and the smoke jobs for the frozen non-primary spikes.

Gate P0 — Primary-chain completion covenant (current product prerequisite)

Definition of Done: ProofForge must complete the three priority chains in implementation order — solana-sbpf-asm, evm (Ethereum), and wasm-near (NEAR/Wasm) — before any additional chain advances beyond docs-only research or frozen spike maintenance (D-045). Status: Open

Acceptance criteria

Sign-off

Not yet closed. Closing P0 requires target-by-target evidence that Solana, Ethereum/EVM, and NEAR/Wasm satisfy the production-grade DoD in D-045. Gate G0 evidence is necessary but not sufficient.

Gate G1a — CosmWasm M4 (frozen, D-044)

Status: Frozen. Per D-044/D-045, the wasm-cosmwasm spike stays at its current M1/M2 state until Gate P0 closes. No registry-stage advancement, no M3/M4.

Gate G1b — Aptos M4 (frozen, D-044)

Status: Frozen. Per D-044/D-045, the move-aptos spike stays at its current M1/M2 state (Counter printer + golden + test gate, B1 state-id fidelity) until Gate P0 closes. No M3 (testkit CLI-wrapped executor), no M4 (registry stage → Experimental), no move-sui start.

Gate G2 — both Tier-1 exits (not started)

Status: Not started. Opens only after G1a and G1b close, which themselves require Gate P0 to close first (D-045).